CANADIAN COAST GUARD ATLANTIC REGION HEADQUARTERS
The scope of work included the supply, installation, and commissioning of the BACnet Building Automation System (BAS) to Leed Gold Certification standards alongside the supply, start-up, and commissioning of HVAC equipment.
Details
Duration: 2016-2019
Location: St. John’s, NL
Project Type: New Construction
Building Size: 66,629 Square Feet
Highlights:
- Implementation of a highly efficient geothermal heating/cooling system harnessing sea water as a sustainable energy source
- Installation of 24 ABB Variable Frequency Drives for enhanced operational control.
- Supply of 117 Air Terminal Units, four Carrier Semi-Custom Air Handling Units, two Aldes Heat Recovery Units, 112 Hydronic Heating Coils, and all associated HVAC equipment
- Integration of a sophisticated control system utilizing Automated Logic Controls (ALC) to ensure optimal temperature regulation and superior indoor air quality, achieved through monitoring of CO2 levels and demand control ventilation
- Comprehensive BACnet integration of multiple protocols within the Energy Management System (EMS) framework to facilitate data calculation and provisioning, contributing towards LEED Gold Certification