Mews centre rendering

MEWS CENTRE REPLACEMENT

The scope of work included the supply, installation, and commissioning of the BACnet Building Automation System (BAS) alongside the supply, manufacturing, start-up, and commissioning of HVAC equipment.

Details

Duration: 2021-2024

Location: St. John’s, NL

Project Type: New Construction

Building Size: 60,000 Square Feet

Highlights:

  • Comprehensive control system designed to manage various operational requirements, ranging from indoor air quality within the gymnasium and aquatics center to the precise regulation of pool water temperature
  • Highly efficient geothermal heating/cooling infrastructure, utilizing geothermal wells as the primary energy source. This system ensures precise temperature control throughout the entire complex, including the pool water
  • Supply of two Carrier Semi-Custom Air Handling Units, four Water-to-Air Heat Pumps, a fully customized EneRound Energy Recovery Unit, one Desert Air Dehumidification Unit, a Tandem Chillers Modular Heat Pump, and all other HVAC equipment
  • Installation of 28 ABB Variable Frequency Drives to enhance operational flexibility and efficiency.
  • Full integration of the system with the city server to allow remote access and management.